Design of factories: OSB Kronospan. Pre-production Area.

Objects: Feeding conveyors, wet bins.

Function: Transportation of strands from strander facility. Storing of the strands. Transportation of strands to the drier facilities.

Main structural description: Equipment installed on in-situ RC pedestals with the foundation of in-situ RC slab/pile caps with RC precast driven piles.

Equipment:

  • Feeding conveyors;
  • Wet bins BB 210;
  • Equipment supplier — Hombak;
  • Volume — 210 m2;
  • Total length — 25.9 m.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Objects of design:

  • Pile foundation (RC driven precast piles);
  • RC foundation slab;
  • RC pile caps;
  • Cast-in details.

Clancy Engineering - Designing the Future!
 

Similar projects
Kronospan factory / Egoryevsk
Kronospan Factory Ancillary Facilities / Egoryevsk 
HI-LEX Factory / Samara

Project Information

2013
5800 м2

Services

Specializations

Stages

    • Concept, Proekt, Working documentation complete.
    • Author’s supervision complete.

Architects

Confidential

Client

  • Confidential