Main production process of the raw boards for the further processing.

The process consists of the following steps:

  • Preparation and positioning of the pre-glued chips on the forming station;
  • Forming and pre-pressing;
  • Main pressing process;
  • Transportation of the raw boards from the press facility.

Objects:

  • Forming line;
  • Pressing line.
  • Description: Part of the main factory building.

Main structures — steel frame of columns and beams. External walls — RC precast sandwich panels. Foundation — in-situ pile caps and foundation beams with the RC precast driven piles. Press pit foundation — in-situ RS foundation slab with the RC precast driven piles. Floor slab — in-situ RC ground bearing slab. Pits and electrical manholes — in-situ RC; Pedestals and piers for equipment and conveyors — in-situ RC.

Object: Forming line

Location: Kronospan OSB Factory. Production Area.
Function: Forming, pre-pressing, preparation for pressing, transportation.
Forming line length — 75m.

Description: Equipment installed on in-situ RC pedestals with the foundation of in-situ RC ground bearing slab.

Equipment:

  • Forming station;
  • Forming line conveyors;
  • Press equipment for pre-pressing process.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.


Objects of design:

  • Pile foundation (RC precast driven piles) for frame columns;
  • RC pile caps for frame columns;
  • RC Ground bearing foundation slab;
  • RC pedestals;
  • RC trenches;
  • RC electrical manholes;
  • Precast RC plinth panels;
  • Cast-in details.

Object: Pressing line

Location: Kronospan OSB Factory. Production Area.

Function: Pressing, transportation to finishing line.

Press type — Multi-daylight hot-press;
Number of daylights — 16;
Number of cylinders — 6;
Depth of the press pit — 7.5m;
Length of the press pit — 56m;
Width of the press pit — 11m.


Description: Sheet piling due to lower level of the press pit.

Equipment installed on in-situ RC wall, piers and pedestals with the foundation of in-situ RC foundation slab and RC precast driven piles.

Pits and trenches — In-situ RC.

Press equipment:

  • Mating chain conveyor;
  • Overhead chain conveyor;
  • Transfer belt conveyor;
  • Screen return conveyer;
  • Double deck pre-loader;
  • Press loader;
  • Hydraulic hot press with screen infeed mechanism;
  • Press unloader;
  • Screen discharge chain conveyors.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Objects of design:

  • Sheet piling for press pit foundation;
  • Pile foundation (RC precast driven piles) for press pit;
  • Pile foundation (RC precast driven piles) for frame columns;
  • Consideration of vibration loads form equipment;
  • Pile foundation (RC vibro-driven precast piles with vibration monitoring) for trestle bridge in press area;
  • RC pile caps for frame columns;
  • RC foundation beams;
  • RC foundation slab for press pit;
  • RC walls and piers for the press;
  • RC Ground bearing foundation slab;
  • RC pedestals;
  • RC trenches and pits;
  • RC electrical manholes;
  • Precast RC plinth panels;

 

Clancy Engineering - Designing the Future!
 

Similar projects
Kronospan factory / Egoryevsk
Workshop Facility / Egoryevsk 
HI-LEX Factory / Samara

Project Information

2011
3600 м2

Services

Specializations

Stages

    • Concept, Proekt, Working documentation complete.
    • Author’s supervision complete.

Architects

Confidential

Client

  • Confidential