Clancy Engineering participated in reconstruction of the large shopping complex in the west of Moscow. Our team elaborated structural and MEP solutions, as well as landscaping solutions for the existing complex. The object was constructed and commissioned during 2003-2005 and had a number of disadvantages due to physical and functional «moral» deterioration of the systems and building structures. Before execution of design works, our company performed a number of technical investigations in order to identify non-compliance of MEP systems and structures with the current Russian Federation norms and to identify defects in the existing structures, including due to the changes in payloads at the Stage of the Object reconstruction.

The program of investigations included the following:

  • Architectural measurements and investigations of the building envelope;
  • Geological investigations;
  • Instrumental and visual inspection of the building structures;
  • Instrumental and visual inspection of MEP systems of the building.

Investigations of the building structures and MEP networks allowed to make up for the missing data on the object and to elaborate cost-efficient MEP solutions taking into account the Client’s wishes and the current situation. 

During the work on the project our team paid special attention to the following:

  • Class of energy efficiency «А»;
  • Current norms of fire-fighting protection;
  • Modern technological solutions and tendencies for MEP networks;
  • The newest and most efficient methods of the structures strengthening, which allow to realize architectural solutions and modern design.

The scope of Clancy Engineering works:

  • Elaboration of structural solutions at Project and Working Documentation Stages. Clancy Engineering team performed technical assessment of the existing design and as-built documentation, as well as inspected the building condition for further implementation of the architectural concept. Working documentation included new structures, lift shafts openings, change of the escalators position, lift staircases, atriums, strengthening of the structures and change of the existing layouts.
  • Elaboration of MEP solutions (internal systems). Clancy Engineering elaborated project documentation and working documentation of the whole complex in the scope of «shall & core». Principles of MEP networks were completely revised according to the new concept from the Client.
  • Elaboration of the scheme of the land plot layout.

Our specialists helped the Client to minimize expenses on engineering equipment and installation of the systems. We did our best to satisfy the Client’s demands to preserve commercial attractiveness of the facility. 

Clancy Engineering - Designing the Future!

 

Similar projects
MARI Mall / Moscow
Castorama Shopping Center Extension / Lyubertsy
Tweed Mall / Moscow

Project Information

2017
457702 м2

Services

Specializations

Stages

    • Investigations
    • Project Documentation
    • Expertise
    • Working Documentation

Architects

  • Blank Architects / RU / PL

Client

  • Confidential