Clancy Engineering took part in the renovation of a shopping mall in the southern administrative district of Moscow in order to increase its commercial attractiveness and meet the demands of the market.
The shopping mall is located at the intersection of the most important metropolitan highways and houses about 200 Moscow stores under its roof, gathering all the goods and services desired by consumers in one space - from grocery stores to cinemas and beauty salons.
In 2016 Clancy Engineering prepared design solutions on the modernization of retail and public areas of the shopping mall.
The following main areas were included: pedestrian galleries, atriums, entrances, and retail areas.
The scope of works:
MEP systems
We performed investigations of the existing systems of the complex, prepared design solutions for all MEP systems in the areas under renovation while complying with the current RF norms, and meeting the high-quality standards of the Client.
According to the new architectural concept, the areas under renovation included the following systems: fire suppression, ventilation, communication, electrical systems, water supply, and sewerage systems.
The main difficulty in the design was the need to integrate the new elements into the existing systems of the complex, a tight schedule, and doing investigations in a working shopping mall.
Structural solutions
Our team of design engineers provided technical support and consultations during the preparation of architectural solutions and MEP solutions in terms of project feasibility within the existing structures.
During the work on this project, our company issued Work documentation in the amount necessary to perform building and installation works in the areas under renovation.
Clancy Engineering – Designing the Future!
Similar projects:
MARI Mall / Moscow
NEBO Mall / Moscow
Grozny Mall / Grozny
2016 | 144484 м2 |
Confidential