The concept of the shopping complex includes a supermarket «Lenta», a baby store, a shopping gallery, restaurants area, a cafe, foodcourt area, children’s entertainment center and parking for 1300 lots.
Clancy Engineering was appointed to provide structural and MEP design in part of Preproject documentation.
Clancy Engineering scope of works concerning design of shopping centers:
Our company performed the analysis of foundation types on the basis of the received results of geological investigations. Our engineers also executed calculation of the load-bearing capacity depending on various loads and geological conditions
Concrete and reinforcement consumption was estimated for foundations for all areas of the complex.
Our MEP team performed principal calculations of the shopping centre demands in energy sources — electricity, water, sewage, heating energy, cold.
The basis for the calculations was the architectural concept from «Blank Architects».
Calculations were performed according to the current RF norms and based on experimental data of the implemented projects of similar functional use.
Specifications for the principal equipment and materials were prepared with level of accuracy corresponding to that of Tender documentation in order to take into account all the expenses on installation of MEP systems of the complex.
Clancy Engineering - Designing the Future!
Similar projects
MARI Mall / Мoscow
Grozny Mall / Grozny
NEBO Shopping Mall / Moscow
2016 | 35000 м2 |