CLANCY ENGINEERING performed structural and MEP investigations for the former textile factory in Ivanovo. The factory used to be the city-forming enterprise of textile production and was built at the beginning of 1960s. The building framework consists of solid RC prefabricated structures. Total area of investigations – 50 511 m2.
Works on structural investigations and MEP networks were carried out to assess technical condition of structures and systems, indicate the existing defects and damages, elaborate recommendations on their elimination, as well as to assess further operation of the building as a hypermarket.
Principal aims of investigations:
Our team performed full investigation of the factory, which included the following:
As a result of works, carried out by CLANCY ENGINEERING, our design team issued technical conclusions on the condition of the existing structures and MEP networks, elaborated recommendations on defects elimination and worked out principal schemes on strengthening of the existing structures.
Clancy Engineering - Designing the Future!
Similar projects
MARI Mall / Moscow
Logistics Park «Tomilino» / Moscow Region
Gorki Mall Audit / Chelyabinsk
2017 | 50511 м2 |
Confidential