The process consists of the following steps:

  • Loading and transportation of logs to the de-barking equipment;
  • Log de-barking;
  • Control and maintenance of the process;
  • Transportation of de-barked logs to the strander facility;
  • Rejection of timber;
  • Emergency dump of timber.

Objects:

  • De-barker 1 (object B1);
  • De-barker 2 (object B5-1);
  • MCC building (object B2);
  • Process Conveyors (objects B4-1, B4-3, B5-2, B5-4);
  • Emergency dump boxes and bunkers (objects: B3, B4-2, B5-3);
  • De-barker 1th line (B1).

Design of factories: OSB Kronospan. Pre-production Area.
Function: Removal of the bark from the logs.
Description: Equipment installed on in-situ RC piers with the foundation of in-situ RC slab and RC precast driven piles.

Properties:

  • De-barker type — Rotor de-barker Type HRE;
  • Equipment supplier — Hombak.

Equipment:

  • De-barker;
  • Feeding conveyor;
  • Bark rejection conveyor.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Objects of design:

  • Pile foundation (RC precast driven piles);
  • Consideration of vibration loads form equipment;
  • RC pile caps;
  • RC foundation slabs;
  • RC piers and pedestals;
  • Cast-in details.
  • De-barker 2nd line (B5-1)

Location: Kronospan OSB Factory. Pre-production Area.
Function: Removal of the bark from the logs.
Description: Equipment installed on in-situ RC piers with the foundation of in-situ RC slab and precast RC precast driven piles.

Properties:

  • De-barker type — Rotor de-barker LRE 800;
  • Equipment supplier — Leonhardt.

Equipment:

  • De-barker;
  • Feeding conveyor;
  • Bark rejection conveyor.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Objects of design:

  • Pile foundation (RC precast driven piles);
  • Consideration of vibration loads form equipment;
  • RC pile caps;
  • RC foundation slabs;
  • RC piers and pedestals;
  • De-barker RC frame;
  • Cast-in details;
  • MCC building (B2).

Design of factories: OSB Kronospan. Pre-production Area.
Function: Motor Control Center. Maintenance.

Main spaces:

  • MMC room;
  • Pump room;
  • Hydraulic room.
  • Description: Single story building. Pile foundation with RC in-situ foundation. Brickwork external walls and lightweight blockwork internal walls. Roof slab — in-situ RC.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Objects of design:

  • Pile foundation (RC driven precast piles);
  • RC foundation slab;
  • External brick walls, internal block walls;
  • RC roof slab;
  • Log rejection and emergency dump bunkers (B3, B4-2, B5-3).

Location: Kronospan OSB Factory. Pre-production Area.
Function: Rejection of logs and emergency dump.
Description: In-situ RC bunker with the foundation of slab and precast driven piles.
Equipment: Feeding conveyor.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Objects of design:

  • Pile foundation (RC precast driven piles);
  • Consideration of vibration;
  • RC foundation slab;
  • RC walls;
  • Cast-in details.
  • Process Conveyors (B4-1, B4-3, B5-2, B5-4).

Design of factories: OSB Kronospan. Pre-production Area.
Function: Transportation of de-barked logs to strander facility.
Description: Equipment installed on in-situ RC pedestals with the foundation of in-situ RC slab/pile caps and precast RC driven piles.
Equipment: Feeding conveyors.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Objects of design:

  • Pile foundation (RC precast driven piles);
  • Consideration of vibration loads form equipment;
  • RC pile caps;
  • RC foundation slab;
  • RC pile caps;
  • RC pedestals.

Clancy Engineering - Designing the Future!
 

Similar projects
Kronospan factory / Egoryevsk
Kronospan Factory Ancillary Facilities / Egoryevsk 
HI-LEX Factory / Samara

Project Information

2013
2300 м2

Services

Specializations

Stages

    • Concept, Proekt, Working documentation complete.
    • Author’s supervision complete.

Architects

Confidential

Client

  • Confidential