Within design of office buildings, CLANCY ENGINEERING was appointed for elaboration of MEP systems solutions for the office premises of «Hasbro» in Moscow. The office is located in BC Country Park III with «A» building class.

The office premises of the Client occupy one floor of the business centre with the total area of premises around 1200 m2.

The architectural concept included open space areas, conference halls, meeting rooms and auxiliary premises (wardrobe, mini-kitchen, server room, etc.).

CLANCY ENGINEERING scope of works included the following:

  • Elaboration of Concept Stage for MEP systems;
  • Tender documentation elaboration;
  • Working documentation elaboration;
  • Approval of documentation with the building management;
  • Author’s supervision.

CLANCY ENGINEERING designed the following MEP systems:

  • Heating, ventilation and air conditioning;
  • Water supply and sewage;
  • Electric supply and electric lighting;
  • Sprinkler water fire fighting;
  • Access control and management;
  • Structured cabling system.

CLANCY ENGINEERING executed additional checking calculations for heat gains/losses for the premises upon the special request from the Client.

Clancy Engineering - Designing the Future!

 

Similar projects
iCITY High-Rise Business Center / Moscow
Office Park COMCITY / Moscow
BC Danilovskaya Manufactura / Moscow

Project Information

2015
1200 м2

Services

Specializations

Stages

    • Concept 
    • Tender Documentation
    • Working Documentation
    • Author`s Supervision

Architects

  • AHR Architects / PL

Client

  • AHR Architects