Facilities for this stage are engaged throughout all production cycle.

The process consists of the following steps:

  • First treatment of the timber to further transportation to Hog and Boiler building;
  • Rejection of the waste;
  • Transportation of the prepared timber to the Hog and Boiler building;
  • Transportation of the prepared timber to the Hog and Boiler building;
  • Transportation of the crushed timber to the second treatment and sorting;
  • Second treatment and sorting;
  • Transportation of the prepared timber to the Boiler building.
  • Removal and storage of the small particles and dust during the pre-production and production processes;
  • Storage of the chips.

Objects:

  • Process conveyors (objects K1, K2);
  • Bag house 6 (object K3);
  • Moving floor (object K4);
  • Moving floor (object K5);
  • Silo (object K11);
  • Bag houses 20, 7/8 (object K12);
  • Bag house 9.5 (object K13);
  • Feeding Conveyors (K1, K2)

Design of factories: OSB Kronospan. Pre-production Area.
Function: Transportation of chips to Hog building.
Description: Equipment installed on in-situ RC pedestals with the foundation of in-situ RC pile caps and precast RC precast driven piles.
Equipment: Feeding conveyor

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Objects of design:

  • Pile foundation (RC precast driven piles);
  • RC pile caps;
  • RC pedestals.
  • Bag houses 4-6. Hydraulic equipment (K3)

Design of factories: OSB Kronospan. Production Area.
Function: Removal and storage of the small particles and dust during the production processes.
Description: Equipment installed on in-situ RC pedestals with the foundation of in-situ RC slab.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Objects of design:

  • RC Ground bearing foundation slab;
  • RC pedestals;
  • RC trenches and pits;
  • Cast-in details.
  • Moving floor (K4)

Location: Kronospan OSB Factory. Pre-production Area.
Function: First treatment of the timber to further transportation to Hog and Boiler building. Rejection of the waste. Transportation of the prepared timber to the Hog and Boiler building.
Description: The building includes: moving floor area, main pit, hydraulic equipment room and bump bunker.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Equipment: Feeding conveyors, moving floor equipment.

Objects of design:

  • Pile foundation (RC precast driven piles);
  • RC foundation slab;
  • RC walls of the main pit;
  • RC walls of the building;
  • RC walls of the dump bunker;
  • Cast-in details;
  • Moving floor (K5).

Design of factories: OSB Kronospan. Pre-production Area.
Function: Second treatment and sorting. Transportation of the prepared timber to the Boiler building.
Description: The building includes: moving floor area, main pit and hydraulic equipment room.
Equipment: Feeding conveyors, moving floor equipment.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Objects of design:

  • Pile foundation (RC driven precast piles);
  • RC foundation slab;
  • RC walls of the main pit;
  • RC walls of the building;
  • Cast-in details;
  • Silo 56 (K11).

Location: Kronospan OSB Factory. Pre-production Area.
Function: Storage of the chips.
Description: Includes Silo building and emergency dump bunker.

Structures made of in-situ RC.

Foundation — RC slab with RC precast driven piles.

Height of the Silo — 17m;
Volume of the Silo — 320m2;
Equipment: Feeding conveyors.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Objects of design:

  • Pile foundation (RC precast driven piles);
  • RC foundation slab;
  • Silo RC walls;
  • Silo RC roof slab;
  • RC walls of the bump bunker;
  • Cast-in details;
  • Bag houses 20 and 7/8 (K12).

Design of factories: OSB Kronospan. Production Area.
Function: Removal and storage of the small particles and dust during the production processes.
Description: Equipment installed on in-situ RC foundation ground bearing slab.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Objects of design:

RC Ground bearing foundation slab.
Bag house 9.5 (K13)

Location: Kronospan OSB Factory. Pre-production Area.
Function: Removal and storage of the small particles and dust during the production processes.
Description: Equipment installed on in-situ RC foundation ground bearing slab.

CLANCY ENGINEERING has completed design of the project stages as follows:

  • Concept;
  • Proekt;
  • Working documentation;
  • Author’s supervision.

Objects of design:

RC Ground bearing foundation slab.

Clancy Engineering - Designing the Future!
 

Similar projects
Kronospan factory / Egoryevsk
Workshop Facility / Egoryevsk 
HI-LEX Factory / Samara

Project Information

2013
2800 м2

Services

Specializations

Stages

    • Concept, Proekt, Working documentation complete.
    • Author’s supervision complete.

Architects

Client